Table Meadow III
This project is for the installation of 3,300 feet of 8-inch diameter treated waterline and 3 fire hydrants to serve 21 parcels on Table Meadow Road. Work includes pavement restoration.
This is the third and final section of pipeline on Table Meadow Road. This project will connect the pipelines installed as part of Table Meadow I and II DFLWE's, completing the loop.
The construction contract was awarded in March 2023 to McGuire and Hester. Construction began in June 2023 and was completed in September 2023.