Reports and Studies
Centennial Water Supply Project Audit Report (September 10, 2018)
Conceptual Engineering Report - Final (September 18, 2017)
Geotechnical Engineering Report - Phase III - Final (August 30, 2017)
- Appendix A - Seismologic and Active Fault Investigations
- Appendix B - Surface Discontinuity Data
- Appendix C - Seismic Refraction Surveys
- Appendix D - Core Boring Logs and Core Photographs
- Appendix E - Water Pressure Test Results
- Appendix F - Televiewer and Caliper Data
- Appendix G - Downhole Geophysics
- Appendix H - Laboratory Test Data
- Appendix I - Point Load Test Data
- Appendix J - Durability Test Data - Rock Borrow Area
Roller Compacted Concrete Dam - Opinion of Probable Construction Costs (August 25, 2017)
White Paper on Project Delivery Alternatives (June 19, 2017)
Roller Compacted Concrete Dam - Conceptual Design Criteria Technical Memo (February 16, 2017)
Dog Bar Road Realignment Study (October 12, 2016)
Conceptual-level Opinion of Probable Construction Costs (August 17, 2016)
Preliminary Geotechnical Investigation - Phase II - Final (February 9, 2016)